[Brahms-l] Shift report 20050219 00:00-08:00

From: <apache@brahms-web.brahms.bnl.gov>
Date: Sat Feb 19 2005 - 07:59:51 EST
Shifter leader was SB
Shifters were 


1. 1st New Store around 12:30 am. Beam dumped around 5:40 am
   2nd new store around 6:30 am. Beam stable all night.

2.  Runs:        13258, 13259,  13260, 13261, 13265

    FS@4B3450:   112k,  168k,   201k,  114k,  232k
    MRS@40A1050: 76k,   230k,   249k,  196k,  140k

    Run 13262 
    FS@4 with D1@1219, D2=D3=D4=0
    MRS@40A1050
    FFS(trig 6): 122k

3. Water leak in magnet cooling system fixed. No detector prblems.
   


_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Sat Feb 19 08:01:34 2005

This archive was generated by hypermail 2.1.8 : Sat Feb 19 2005 - 08:01:42 EST