[Brahms-l] run report

From: flemming videbaek <videbaek@rcf.rhic.bnl.gov>
Date: Tue Jan 18 2005 - 14:56:59 EST
There will be beam-experiments from 10pm to 6 am, followed by a 18 hours maintenance period (18 hours for STAR). During this period BRAHMS will look and hopefully fix a few outstanding problems

a) Investigate DC issue (preamp card (1), possible short in a v plane scetion) (RK)
b) Look for one missing TDC signal in beamBeam (BB)
c) Investigate and possible replace L1458A (PS failure Saturday) (RAS,JH)
d) Install a showermax slat for in-beam testing before going into ZDC (DB,EB)
e) Misc HV and signal issue for TFW2 (DB)
f) install HV cables for showermax. (RAS,JH)

----------------------------------------------------------------
Flemming Videbaek
Physics Department
Brookhaven National Laboratory

e-mail: videbaek@bnl.gov
phone: 631-344-4106



_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Tue Jan 18 14:54:12 2005

This archive was generated by hypermail 2.1.8 : Tue Jan 18 2005 - 14:54:37 EST