There will be beam-experiments from 10pm to 6 am, followed by a 18 hours maintenance period (18 hours for STAR). During this period BRAHMS will look and hopefully fix a few outstanding problems a) Investigate DC issue (preamp card (1), possible short in a v plane scetion) (RK) b) Look for one missing TDC signal in beamBeam (BB) c) Investigate and possible replace L1458A (PS failure Saturday) (RAS,JH) d) Install a showermax slat for in-beam testing before going into ZDC (DB,EB) e) Misc HV and signal issue for TFW2 (DB) f) install HV cables for showermax. (RAS,JH) ---------------------------------------------------------------- Flemming Videbaek Physics Department Brookhaven National Laboratory e-mail: videbaek@bnl.gov phone: 631-344-4106 _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Tue Jan 18 14:54:12 2005
This archive was generated by hypermail 2.1.8 : Tue Jan 18 2005 - 14:54:37 EST