[Brahms-l] Shift report 20040430 00:00-08:00

From: Apache <apache@bnl.gov>
Date: Fri Apr 30 2004 - 07:37:56 EDT
------------------------------------------------------------
Date: Fri Apr 30 07:37:56 2004, Shift: 00:00-08:00
Supervisor: EBJ, with: 
Log book#15 pages 116 - 116

Shift Summary:
------------------------------------------------------------
1.  We had beam for a little bit, but it was unpolarized.  They dumped the beam to fill with polarized beam, and they still haven't been able to keep a stable beam.  

2.  None.

3. None.
------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Fri Apr 30 07:38:14 2004

This archive was generated by hypermail 2.1.8 : Fri Apr 30 2004 - 07:38:36 EDT