[Brahms-l] Shift report 20040427 08:00-16:00

From: Apache <apache@bnl.gov>
Date: Tue Apr 27 2004 - 16:17:03 EDT
------------------------------------------------------------
Date: Tue Apr 27 16:17:02 2004, Shift: 08:00-16:00
Supervisor: JHL, with: 
Log book#15 pages 115 - 115

Shift Summary:
------------------------------------------------------------
1. Beam for ~6 hours at zdc~250-200/sec

2. Data (runs 11757 - )
   FS 3deg. 1/1A ~60K   trig. 2
   FS 3deg. 1/2A ~200K  trig. 2
   MRS 90 deg. 2A ~400K trig. 3

3. T2, TPM1 readout problems
   No Magnet, HV trips
------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Tue Apr 27 16:19:22 2004

This archive was generated by hypermail 2.1.8 : Tue Apr 27 2004 - 16:19:46 EDT