[Brahms-l] Shift report 20040423 00:00-08:00

From: Apache <apache@bnl.gov>
Date: Fri Apr 23 2004 - 08:02:28 EDT
------------------------------------------------------------
Date: Fri Apr 23 08:02:28 2004, Shift: 00:00-08:00
Supervisor: hiro, with: 
Log book#15 pages 109 - 109

Shift Summary:
------------------------------------------------------------
1.  one long beam store for entire shift.
2.  See elog
3.  A lot of DAQ problems. see elog.
------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Fri Apr 23 08:02:44 2004

This archive was generated by hypermail 2.1.8 : Fri Apr 23 2004 - 08:03:06 EDT