[Brahms-l] Shift report 20040422 00:00-08:00

From: Apache <apache@bnl.gov>
Date: Thu Apr 22 2004 - 06:17:59 EDT
------------------------------------------------------------
Date: Thu Apr 22 06:17:59 2004, Shift: 00:00-08:00
Supervisor: EBJ, with: 
Log book#15 pages 108 - 108

Shift Summary:
------------------------------------------------------------
1.  We had stable collisions in our area fround around 1:30 to 6:00

2. I was able to take 200k trig 1/4 B field data.
      The runs for this data set were stopped due to the D3 magnet tripping.

  I also took 167k 1/2B field data.
      I noticed that the DAQ was not collecting any data when I stopped this run.  I'm not sure why, but it might have been that the RHIC clock was off.

3. I'm not sure of there is a problem with the DAQ at this point, since it may have been the RHIC clock that was causing the effect where no events were being collected.

  D3 has given me problems since the start of this shift.  I had to call CAD out a number of times, and the new shift crew that came in around 5:30 declared that D3 will have to be down for a while for repairs.


------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Thu Apr 22 06:18:16 2004

This archive was generated by hypermail 2.1.8 : Thu Apr 22 2004 - 06:18:37 EDT