[Brahms-l] Fw: Run-4: Au-Au operation ended

From: flemming videbaek <videbaek@rcf.rhic.bnl.gov>
Date: Fri Apr 02 2004 - 10:31:38 EST
FYI
another congratulary note.

/fv
----------------------------------------------------------------
Flemming Videbaek
Physics Department
Brookhaven National Laboratory

Sent: Friday, April 02, 2004 10:04 AM
Subject: Re: Run-4: Au-Au operation ended


> To all,
> 
> I would like to congratulate everyone for a most successful gold run. 
> Everyone, experimenters and C-A,  contributed in a most significant way 
> to make this a world class performance. I now anxiously await to hear 
> the physics results from the 4 experiments.
> It is now on to polarized protons, a most significant accelerator 
> challenge.
> 
> Derek
> 
> On Apr 2, 2004, at 9:27 AM, Wolfram Fischer wrote:
> 
> > Dear all,
> >
> > at 7am this morning the RHIC Run-4 Au-Au operation
> > ended. In this run we made progress in several areas:
> >
> > - Start-up/ramp-up in 4 weeks (1 week less than planned)
> > - Time in store increased to 53% (65% in 31.2GeV/u operation)
> > - Luminosity steering and collimator setting time reduced to about 
> > 10min
> > - The best 7 days delivered 179(?b)^-1 to Phenix (20-Feb to 26-Feb)
> > - Set-up for 31.2GeV/u run in less than 2 days
> > - Total delivered luminosities:
> > at 100GeV/u relative at 31.2GeV/u
> > (?b)^-1 to Run-2 (?b)-1
> > Phenix 1370 15x 21.8
> > Star 1270 21x 20.7
> > Brahms 560 13x 12.2
> > Phobos 540 7x 12.3
> >
> > It was a pleasure to be the Run Coordinator for so many
> > dedicated, truly professional people. Thank you to all of you.
> >
> > Wolfram
> >
> > -- 
> > Wolfram.Fischer@bnl.gov
> > Tel. +1-631-344-5452
> > Brookhaven National Laboratory
> > Bldg. 911B, Upton, NY 11973, USA
> 

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Fri Apr 2 10:25:38 2004

This archive was generated by hypermail 2.1.8 : Fri Apr 02 2004 - 10:25:56 EST