[Brahms-l] Shift report 20040330 08:00-16:00

From: Apache <apache@bnl.gov>
Date: Tue Mar 30 2004 - 16:00:40 EST
------------------------------------------------------------
Date: Tue Mar 30 16:00:38 2004, Shift: 08:00-16:00
Supervisor: YKL, with: SN
Log book#15 pages 102 - 102

Shift Summary:
------------------------------------------------------------
1. We initially had very high backround for the first store, 
   but a bit of excellent steering cleared that right up.
   Beam for 5.25 hours.

2. RUN      tr3    tr6
   11441    55k    81k
   11442    48k    70k
   11443    16k    24k
   11444  TPC pedestal run  
   11445  Non-TPC pedestal run  
   11447    65k    96k
   11449    60k    88k
   11450    44k    114k   At 4 deg.
   TOTAL    290k   474k
   11455  In progress...

3. The runserver was a real pest at times.

------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Tue Mar 30 16:00:58 2004

This archive was generated by hypermail 2.1.8 : Tue Mar 30 2004 - 16:01:31 EST