------------------------------------------------------------ Date: Tue Mar 30 00:03:07 2004, Shift: 16:00-24:00 Supervisor: JHL, with: Log book#15 pages 102 - 102 Shift Summary: ------------------------------------------------------------ 1. Beam for 5 hrs and 20 min -1 full store staring at ZDC~650/sec -45 bunches after PHOBOS field flip -background was at high-side and varing tofw/zdc ~ 1.5 -> 4 -> 2 -> 3 -> 2 over the store - currently no beam: "Controls failure" 2. Data -MRS 45 deg 6B 1M program done Another 1M trigger3 to go at 6B -FS 6deg 1/4A 1M program done Now 6deg 1/4B 1M program (350K trigger6 so far) 3. No detector problems ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Tue Mar 30 00:03:40 2004
This archive was generated by hypermail 2.1.8 : Tue Mar 30 2004 - 00:04:11 EST