[Brahms-l] Shift report 20040322 08:00-16:00

From: Apache <apache@bnl.gov>
Date: Mon Mar 22 2004 - 15:58:28 EST
------------------------------------------------------------
Date: Mon Mar 22 15:58:27 2004, Shift: 08:00-16:00
Supervisor: SN, with: PS
Log book#15 pages 95 - 95

Shift Summary:
------------------------------------------------------------
1. Beam for 2.5 hours total.

2. RUN      tr2    tr3
   11238    55k    264k
   11239  Non-TPC Pedestal
   11240  TPC Pedestal
   11244    41k    84k
   11248    50k    143k
   11251    25k    92k
   TOTAL    172k   583k

3. Had to convince the DAQ Control program to cooperate a few
   times.
   Dana fixed the bad camera!

------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Mon Mar 22 15:58:39 2004