------------------------------------------------------------ Date: Sat Mar 20 16:05:14 2004, Shift: 08:00-16:00 Supervisor: PS, with: SN Log book#15 pages 92 - 92 Shift Summary: ------------------------------------------------------------ 1. Long store ended at 10.30. Had some very nice beam from 12. 2. 11174 Minimum bias 11175 Minimum bias 11176 Non-TPC Pedestal tr2 tr3 tr6 11177 62k 55k 82k 11178 115k 107k 157k 11179 115k 122k 175k 11184 82k 96k 138k 11185 170k 161k 245k 11186 100k 108k 162k TOTAL 646k 649k 963k 11187 In progress. (Will get us above 1M on trigger 6.) PS worked on mising 4 planes in the first module of T4. He found out that the problem is caused by mitake in cabling, namely the D1 and D2 cables (providing connection between max. board and tdc) are repleaced.Should be fixed during the next access. 3. T2 tripped, ending run 11184. Well behaved rest of the time. The measured values of the gas line flow rates were (on average) 0.4 above the requested values. ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sat Mar 20 16:05:37 2004
This archive was generated by hypermail 2.1.8 : Sat Mar 20 2004 - 16:06:01 EST