[Brahms-l] Shift report 20040312 08:00-16:00

From: Apache <apache@bnl.gov>
Date: Fri Mar 12 2004 - 15:52:18 EST
------------------------------------------------------------
Date: Fri Mar 12 15:52:18 2004, Shift: 08:00-16:00
Supervisor: hiro, with: 
Log book#15 pages 86 - 86

Shift Summary:
------------------------------------------------------------
1. Beam until 2:15. Then, Quench link interlock.
2.  Run 10933-10941
3.  As the previous shifter said, Io server and Run server hangs.  This is due to the failed network connections.  I changed hosts table.  There might be still residual network problem???
------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Fri Mar 12 15:52:28 2004

This archive was generated by hypermail 2.1.8 : Fri Mar 12 2004 - 15:52:49 EST