------------------------------------------------------------ Date: Fri Mar 12 08:01:15 2004, Shift: 00:00-08:00 Supervisor: CEJ, with: FH Log book#15 pages 86 - 86 Shift Summary: ------------------------------------------------------------ 1) Beam lost at 1:15 (control failure). Beam again from 5:15. 2) Pedetal runs 10924 (TPC) and 10925 FS@10deg A861, MRS@90A1050 10928; tr6: 67K, tr3: ??K 10929; tr6: 100K, tr3: 65K 10930; tr6: 100K, tr3: 87K 10933; still running... 3) The RunServer had to be restarted several times. T3-2-X1 distribution looks bad. No other problems reported. ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Fri Mar 12 08:01:39 2004
This archive was generated by hypermail 2.1.8 : Fri Mar 12 2004 - 08:02:00 EST