[Brahms-l] Shift report 20040306 16:00-24:00

From: Apache <apache@bnl.gov>
Date: Sat Mar 06 2004 - 00:02:04 EST
------------------------------------------------------------
Date: Sat Mar  6 00:02:03 2004, Shift: 16:00-24:00
Supervisor: PJ, with: 
Log book#15 pages 76 - 76

Shift Summary:
------------------------------------------------------------
1. Running fine.We had small access around 21:00. Second beam lost at 23:55.

2. All runs was: FS 8deg full B, MRS 1/2 B

        tr2   tr3
10782   93k   Bad   (BBL non-func)
10784   58k   Bad   (BBL non-func)
10785   44k   0     (BBL non-func)
10786   50k   0     (BBL non-func)
10787   65k   69k
10788   49k   72k

3. BBL2 mainframe was replaced, at around 21:30. After that BBL worked.
During run 10786 pii4 spontaniously logged out, effectivly shutting down DAQ. I don't think the data suffered, just thought I would mention it.
------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Sat Mar 6 00:02:42 2004

This archive was generated by hypermail 2.1.8 : Sat Mar 06 2004 - 00:03:02 EST