[Brahms-l] Shift report 20040304 08:00-16:00

From: Apache <apache@bnl.gov>
Date: Thu Mar 04 2004 - 15:39:15 EST
------------------------------------------------------------
Date: Thu Mar  4 15:39:14 2004, Shift: 08:00-16:00
Supervisor: HB, with: FH
Log book#15 pages 74 - 74

Shift Summary:
------------------------------------------------------------
1. Beam from 10.12 to 10.43 and 11.55 to 15.00  
   Total of 3.5 hours

2. FS 8DEG and B3450  MRS 90DEG and B1050
 
  run      tr2       tr3

 10751    14.5K     43.7K
 10752  bad run
 10753    49.5K     56.8K      
 10754     10.7K    16.4K
 10755       0K    113.3K  (no trig 2)
 10756     41.6K    59.0K
 10757     34.7K    85.5K
 10758     25.8K    63.9K 

3. no detector problems

------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Thu Mar 4 15:39:29 2004

This archive was generated by hypermail 2.1.8 : Thu Mar 04 2004 - 15:39:53 EST