------------------------------------------------------------ Date: Fri Feb 27 23:58:10 2004, Shift: 16:00-24:00 Supervisor: rw, with: Log book#15 pages 68 - 68 Shift Summary: ------------------------------------------------------------ 1. Beam is on at 18:00 till 22:30. The second store is made at 23:30. 2. run trg2 trg3 10639 133k trig2 is lost 10640 33k 105k trig2 is back 10641 special request run FS 1/4A @ 40deg. Trig 6(100Hz)+ Trg 4,5(10Hz) 1hr run 10642 special run 2. Same FS field. Trg 4+5 (100Hz) 10643 TPC pedestal run 10644 Non-TPC pedestal run 10645 running FS 1/2A at 8deg. MRS B2255 at 40 deg. 3. No detector problem. 4. In the beginning of the run (10639) trg2 was not fired. It seems a connector contact problem. After checking the trigger signals, the trigger came back. ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Fri Feb 27 23:58:33 2004
This archive was generated by hypermail 2.1.8 : Fri Feb 27 2004 - 23:58:53 EST