[Brahms-l] Shift report 20040222 08:00-16:00

From: Apache <apache@bnl.gov>
Date: Sun Feb 22 2004 - 16:02:58 EST
------------------------------------------------------------
Date: Sun Feb 22 16:02:58 2004, Shift: 08:00-16:00
Supervisor: JHL, with: 
Log book#15 pages 64 - 64

Shift Summary:
------------------------------------------------------------
1. Beam for ~7hrs
with 2 stores:  8:20-12:50 and 13:35-
starting ZDC rate: ~4200/sec 
-------------
2. Data:
FS 4deg. 1/2B finished 2M trig2. program
FS 3deg. 1/2B finished 1M trig2. program 
FS 3deg. 1/2A 2M trig2 in progress

MRS 40deg. 6B 4M in progress
-------------
3. Program
FS
1. finish FS 3deg. 1/2A 2M
2. FS 3deg. 1A 1.5M
3. FS 3deg. 0 field (1/2A in D1) 50K
4. FS 3deg. 0 field (1/2A in D2) 50K
5. FS 8deg. 1/2A 2M 
..
MRS
1. finish MRS 40deg. 6B 4M
2. MRS 40deg. 40deg. 6A 3M
-------------
No detector problems
 
  
------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Sun Feb 22 16:03:11 2004

This archive was generated by hypermail 2.1.8 : Sun Feb 22 2004 - 16:03:50 EST