------------------------------------------------------------ Date: Sat Feb 21 08:18:03 2004, Shift: 00:00-08:00 Supervisor: DO, with: Log book#15 pages 63 - 63 Shift Summary: ------------------------------------------------------------ 1. One store from 1 to 5:30 am. New store started at 7am. 2. Data: runs 10457 -> 10460, 10464 still running FS 4d B1/1: 576k tr2 MRS 40d B1/2: 773k tr3 TPC ped: 10462 Non TPC ped: 10461 3. No problem until I turned TPC and DC's HV when beam conditions were ok (~7.30am). TPM1 tripped, I got it back to business but then mainframe L1458B (DC's) was off. I think it is brahvo which screwed up the mainframe state. Then, all DC demand HV's were set to 0, could not load config files due to miserable crashes, had to set all demand HVs by hand for each DC channel! and then switch them on by hand as well. This of course caused a waste of time of ~ 1/2 hour of good beam... ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sat Feb 21 08:18:18 2004
This archive was generated by hypermail 2.1.8 : Sat Feb 21 2004 - 08:18:34 EST