[Brahms-l] Shift report 20040217 00:00-08:00

From: Apache <apache@bnl.gov>
Date: Tue Feb 17 2004 - 07:56:14 EST
------------------------------------------------------------
Date: Tue Feb 17 07:56:14 2004, Shift: 00:00-08:00
Supervisor: BB, with: RK
Log book#15 pages 60 - 60

Shift Summary:
------------------------------------------------------------
1. Beam for 3.5 hours
   Beam was low  (ZDC=900 Hz) due to booster extraction  
   problem.

2. Three good runs, all at 4d for FS at full field, A      
   polarity, MRS at 45 d B1050

   Run 10405   91k trigger 2   133k trigger 3
   Run 10406   62k trigger 2   134k trigger 3
   Run 10407   62k trigger 2   144k trigger 3

3. No detector problems. Carbon dioxide pressure in T1 and T2 
   is at 100.5 instead of 99.0.

------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Tue Feb 17 07:56:39 2004

This archive was generated by hypermail 2.1.8 : Tue Feb 17 2004 - 07:56:54 EST