[Brahms-l] Shift report 20040130 08:00-16:00

From: Apache <apache@bnl.gov>
Date: Fri Jan 30 2004 - 16:03:30 EST
------------------------------------------------------------
Date: Fri Jan 30 16:03:29 2004, Shift: 08:00-16:00
Supervisor: sl, with: 
Log book#15 pages 45 - 45

Shift Summary:
------------------------------------------------------------
1.One good store lasting about 4 hours. Access from one and lasting the rest of the shift.
2.Done 8deg 0 field runs at various settings. and loads of zero field runs at 40 deg. 
3.No problems with the detector untill we tried to improve it. Fs will be useless untill next access.
------------------------------------------------------------