[Brahms-l] Shift report 20040129 00:00-08:00

From: Apache <apache@bnl.gov>
Date: Thu Jan 29 2004 - 07:50:01 EST
------------------------------------------------------------
Date: Thu Jan 29 07:50:00 2004, Shift: 00:00-08:00
Supervisor: EJ, with: 
Log book#15 pages 44 - 44

Shift Summary:
------------------------------------------------------------
1. There was beam for about half the shift.  They took a while to get another store once they dumped the store from the previous shift.

2. I finished off three data runs. 9930, 9931, 9934.
I took a TPC and a non TPC pedestal run between stores. 
Currently, I am taking another run. 9935.

3. H2 still has the two missing channels, and channel 2 in the TRMRS looks low. 
------------------------------------------------------------