------------------------------------------------------------ Date: Sun Jan 25 07:32:49 2004, Shift: 00:00-08:00 Supervisor: Ionut ARSENE, with: Log book#15 pages 42 - 42 Shift Summary: ------------------------------------------------------------ 1. Beam for almost the entire shift. No problems. 2. TPC and non-TPC pedestals (9849 and 9848, respectively) The setting D5@B2255 with MRS at 40deg is done. (run 9847) I changed the polarity in D5 to A, same current. The next runs are for this setting: 9850, 9851, 9852, 9853. FS settings for the entire shift: 10deg with D1@B1219. This setting is DONE too. 3. No problems with the detectors. ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sun Jan 25 07:33:02 2004
This archive was generated by hypermail 2.1.8 : Sun Jan 25 2004 - 07:33:21 EST