[Brahms-l] Shift report 20040120 16:00-24:00

From: Apache <apache@bnl.gov>
Date: Tue Jan 20 2004 - 00:14:52 EST
------------------------------------------------------------
Date: Tue Jan 20 00:14:51 2004, Shift: 16:00-24:00
Supervisor: JHL, with: 
Log book#15 pages 37 - 37

Shift Summary:
------------------------------------------------------------
1. Beam for 7.5 hrs (ZDC 2000 -> 350/sec)
   ZDC/TOFW ~ 1.2 - 1.5
2. MRS@90deg. FS@10deg. (T3 off)
   run 9771 (FS 430A/MRS 2255B)
   192K trigger2 500K trigger6 94K trigger3 
   run 9772 (FS 430A/MRS 2255B) 
   102K trigger2 265K trigger6 50K trigger3
   run 9773 (FS 608A/MRS 2255B)
   112K trigger2 308K trigger6 61K trigger3
   run 9774 (FS 608A/MRS 2255B)
   76K trigger2 210K trigger6 42K trigger3
3. No new detector problems
   (See the previous e-log for T3 problems)
    

------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Tue Jan 20 00:15:17 2004

This archive was generated by hypermail 2.1.8 : Tue Jan 20 2004 - 00:15:36 EST