------------------------------------------------------------ Date: Mon Jan 19 08:09:10 2004, Shift: 00:00-08:00 Supervisor: ZIS, with: Log book#15 pages 37 - 37 Shift Summary: ------------------------------------------------------------ 1.Beam from the previos shift until 0:47, and the from 02:00 until the end of the shift. 2. Data runs: 9759 - 161K @trig6, 43K @trig3 (MRS 90, FS 12, FS12) 9760 - 346K @trig6, 91K @trig3 (MRS 90, FS 12, FS12) 9761 - 273K @trig6, 71K @trig3 (MRS 90, FS 12, FS12) 9762 - 186K @trig6, 36K @trig3 (MRS 90, FS 10, FS10) 9763 - 121K @trig6, 23K @trig3 (MRS 90, FS 10, FS10) 3. -FS and BF rotated from 12 to 10. -H1 top 16 is out. Need to check if it is a dsic. or a tdc Adc looks fine.(db) -DVM for t1 and t2 are not working. The Hv is on so not sure what the problem is. (db) ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Mon Jan 19 08:09:22 2004
This archive was generated by hypermail 2.1.8 : Mon Jan 19 2004 - 08:09:40 EST