------------------------------------------------------------ Date: Sun Jan 11 15:59:53 2004, Shift: 08:00-16:00 Supervisor: Oana Ristea, with: Ionut Arsene Log book#15 pages 30 - 30 Shift Summary: ------------------------------------------------------------ 1. Beam from the beggining of the shift until 9:00. After that there was three unsuccesfully attempts to get beam. 2. 9550 - Data run with FS@4deg (1/sqrt{2}A) and MRS@90 deg (1050A) - 126k events for trig.6 9551 - Non-TPC pedestal run 9552 - TPC pedestal run 3. H2 TDC Top25 not working. ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sun Jan 11 16:03:23 2004
This archive was generated by hypermail 2.1.8 : Sun Jan 11 2004 - 16:03:32 EST