------------------------------------------------------------ Date: Sat Jan 10 00:07:28 2004, Shift: 16:00-24:00 Supervisor: KH, with: CEJ Log book#15 pages 27 - 27 Shift Summary: ------------------------------------------------------------ 1. The machine was perfoming well. Beam from 16.00 to 18.45 and again from 22.10 (still running). 2. FS @ 4 deg. D1=3450A. MRS @ 90 deg. D5=1050B data runs: 9500, tr6 200K 9502, tr6 17K 9505, tr6 120K 9508, tr6 200K 9509, tr6 200K 9510 still running pedestal runs: 9506, 9507 3. TPC didn't have a good pedestal run before run 9500. H2 top 25 time is dead. T5-1 missing wires (since 9493). ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sat Jan 10 00:07:40 2004
This archive was generated by hypermail 2.1.8 : Sat Jan 10 2004 - 00:07:49 EST