------------------------------------------------------------ Date: Thu Jan 1 23:56:11 2004, Shift: 16:00-24:00 Supervisor: Steve Sanders, with: Oana Ristea Log book#15 pages 20 - 20 Shift Summary: ------------------------------------------------------------ 1. Beam from 16-20 and from 23 until now. 2. Run 9307 - D1, D2, D3, D4 = 1/4B, D5 = 350B - 146k (tr1); run 9309 - D1, D2, D3, D4 = 1/4B, D5 = 350B - 302k (tr1); run 9310 - D1, D2, D3, D4 = 1/4B, D5 = 350B - 44k (tr1); run 9311 - D1, D2, D3, D4 = 1/4B, D5 = 350B. 3. Checked NIM-ECL converter for ZDC gate. Looks good. Also checked that all LVL0 gates lead to ZDC gate. Checks. Why all the zero channels? ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Thu Jan 1 23:56:21 2004
This archive was generated by hypermail 2.1.8 : Thu Jan 01 2004 - 23:56:38 EST