------------------------------------------------------------ Date: Thu Jan 1 00:48:53 2004, Shift: 16:00-24:00 Supervisor: Oana Ristea, with: Log book#15 pages 20 - 20 Shift Summary: ------------------------------------------------------------ 1. Beam until 5 pm and from 7.45 pm until now. 2. Run 9288 - D1, D2 = 1/4 A, D5 = 350 A - 71k events (tr1); run 9289 - D1, D2, D3, D4 = 1/4 A, D5 = 350 A - 50k events (tr1); run 9290 - non TPC pedestal run; run 9291 - D1, D2, D3, D4 = 1/4 A, D5 = 350 A - 198k events (tr1); run 9292 - D1, D2, D3, D4 = 1/4 A, D5 = 350 A - 195k events (tr1); run 9293 - D1, D2, D3, D4 = 1/4 A, D5 = 350 A - 269k events (tr1). 3. All detectors are up and running. ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Thu Jan 1 00:49:03 2004
This archive was generated by hypermail 2.1.8 : Thu Jan 01 2004 - 00:49:22 EST