------------------------------------------------------------ Date: Sun Dec 28 07:33:52 2003, Shift: 00:00-08:00 Supervisor: Oana Ristea, with: Catalin Ristea Log book#15 pages 17 - 17 Shift Summary: ------------------------------------------------------------ 1. Starting the shift, the machine made some background studies for Phenix, so we had beam around 2 am. The beam was dumped at 5,30 am (yellow beam highly debunched). Waiting to refill, we got "RHIC CORRECTOR POWER SUPPLY/MAGNET PROBLEM - Making RHIC access to replace power supply bi8-th11". 2. Two data runs: 9263 - D1 1/4A, D2 1/4A, D5 350A ~ 450k events 9264 - D1 1/8A, D2 1/8A, D5 350A ~ 70k events 3. No critical new problems found for detectors. ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sun Dec 28 10:13:59 2003