From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat May 10 2003 - 07:49:36 EDT
------------------------------------------------------------ Date: Sat May 10 07:49:36 2003, Shift: 00:00-08:00 Supervisor: sjs, with: Log book#14 pages 103 - 103 Shift Summary: ------------------------------------------------------------ Fairly smooth running until 5:30 when beam was lost due to a rotator quench link interlock. Finished 12 deg. 1/4A setting (run 8877). Started 12 deg. 1/2A field (runs 8878,8881,8885, and 8886), taking about 370 trig 2 events during the shift. ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Sat May 10 2003 - 07:54:14 EDT