Shift report 20030510 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat May 10 2003 - 07:49:36 EDT

  • Next message: Apache: "Shift report 20030510 08:00-16:00"
    ------------------------------------------------------------
    Date: Sat May 10 07:49:36 2003, Shift: 00:00-08:00
    Supervisor: sjs, with: 
    Log book#14 pages 103 - 103
    
    Shift Summary:
    ------------------------------------------------------------
    Fairly smooth running until 5:30 when beam was lost due to a rotator quench link interlock.
    Finished 12 deg. 1/4A setting (run 8877).  Started 12 deg.  1/2A field  (runs 8878,8881,8885, and 8886), taking about 370 trig 2 events during the shift.
    ------------------------------------------------------------
    