Shift report 20030508 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Thu May 08 2003 - 08:21:26 EDT

  • Next message: Apache: "Shift report 20030508 08:00-16:00"
    ------------------------------------------------------------
    Date: Thu May  8 08:21:26 2003, Shift: 00:00-08:00
    Supervisor: kh, with: 
    Log book#14 pages 101 - 101
    
    Shift Summary:
    ------------------------------------------------------------
    Beam from approximately 1:00 until it was dumped at 4:30
    at which time they had a fire alarm in sector 8 (PHENIX).
    Luckily it appears to be a false alarm, but it is necessary
    to go into the PHENIX IR and reset everything that tripped
    as a result of the alarm.  That also requires a sweep.  This
    is ongoing at shift end.  
    
    Runs accomplished  trig 2   trig 3   trig 6
    8861                 603     42919    13327
    8862                1453     69276    15706
    8863                1085     50394    11594
    
    ------------------------------------------------------------
    


    This archive was generated by hypermail 2.1.5 : Thu May 08 2003 - 08:26:03 EDT