Shift report 20030505 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Mon May 05 2003 - 23:55:14 EDT

  • Next message: yin.zhongbao@fi.uib.no: "A study of RICH pid efficiency"
    ------------------------------------------------------------
    Date: Mon May  5 23:55:13 2003, Shift: 16:00-24:00
    Supervisor: kh, with: 
    Log book#14 pages 96 - 96
    
    Shift Summary:
    ------------------------------------------------------------
    Run 8827 in progress at shift start;  Store ended at 18:00
    Another store started at 20:00.  Took data while they were steering.  Got 100k before they said they would dump the beam without even releasing it.
    
    Runs accomplished
    Run    trig 3   trig 6
    8827   99K        46K    FS 1/8B
    Change FS magnet polarity to A 
    8828   69K         7.2K  FS 1/2A
    8834  100K        46K    FS 1/8A
    
    No detector problems detected.
    ------------------------------------------------------------
    