From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sun May 04 2003 - 16:30:32 EDT
------------------------------------------------------------ Date: Sun May 4 16:30:32 2003, Shift: 08:00-16:00 Supervisor: kh, with: Log book#14 pages 93 - 93 Shift Summary: ------------------------------------------------------------ 5 1/2 hours beam run trig 3 trig 6 8801 61K 39K (steering was in progress) 8802 70K 45K 8803 55K 6K (FS magnet changed to 1/2B) 8804 41K 4K (vernier scan during this run) Dumped beam at 14:30 ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Sun May 04 2003 - 16:34:19 EDT