Shift report 20030501 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Thu May 01 2003 - 08:14:59 EDT

  • Next message: Apache: "Shift report 20030501 08:00-16:00"
    ------------------------------------------------------------
    Date: Thu May  1 08:14:59 2003, Shift: 00:00-08:00
    Supervisor: igb, with: wk
    Log book#14 pages 88 - 88
    
    Shift Summary:
    ------------------------------------------------------------
    1. Anemic beam until 0215, at which point it was dumped.  MCR tried to get beam again, but still have not succeeded.  
    2. run 8752: 42K trig 3, 35K trig 6.
       run 8753:  7K trig 3,  6K trig 6.
    3. None, except the usual underutilization.
    ------------------------------------------------------------
    


    This archive was generated by hypermail 2.1.5 : Thu May 01 2003 - 08:19:34 EDT