From: Apache (apache@pii3.brahms.bnl.gov)
Date: Fri Mar 21 2003 - 23:31:59 EST
------------------------------------------------------------ Date: Fri Mar 21 23:31:59 2003, Shift: 16:00-24:00 Supervisor: rl, with: Log book#14 pages 71 - 71 Shift Summary: ------------------------------------------------------------ 1. Beam until 1700. Nothing after that because of ATR power supply problem, and later RHIC QPA problem. 2. Data run 8574, with D3 tripped :(FS@ 12deg 1/4A and MRS@ 40 2000B) Run 8578,8579,8580 pedestal and dvm. 3. No detector problems ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Fri Mar 21 2003 - 23:36:25 EST