------------------------------------------------------------ Date: Tue Mar 18 16:05:53 2003, Shift: 08:00-16:00 Supervisor: sjs, with: Log book#14 pages 67 - 68 Shift Summary: ------------------------------------------------------------ Started shift with run 8487. This is a continuation of run 8486 that had some settings wrong. Both runs are 1/8B field, but without BFS (HV crate failure). After store BRAHMS was given access to fix the crate. Around noon we were ready to run with BBS, but RHIC has been having trouble getting a new beam store. The FS is now set at 8 det, 1/4B field. ------------------------------------------------------------