Shift report 20030308 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat Mar 08 2003 - 23:47:00 EST

  • Next message: Ian Bearden: "Re: BNL workshop 6-8 March"
    ------------------------------------------------------------
    Date: Sat Mar  8 23:47:00 2003, Shift: 16:00-24:00
    Supervisor: ykl, with: sl
    Log book#14 pages 52 - 52
    
    Shift Summary:
    ------------------------------------------------------------
    1.Cryogenic problem. No beam for the entire shift.
    
    2.Calibration runs only:
    
    8266(non-TPC),8267(TPC), 8268(DVM).
    
    3.T3 has C3-yv off.
    ------------------------------------------------------------
    


    This archive was generated by hypermail 2.1.5 : Sat Mar 08 2003 - 23:51:09 EST