Shift report 20030306 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Thu Mar 06 2003 - 08:00:59 EST

  • Next message: Bjorn H Samset: "Re: BNL workshop 6-8 March"
    ------------------------------------------------------------
    Date: Thu Mar  6 08:00:58 2003, Shift: 00:00-08:00
    Supervisor: ZY, with: 
    Log book#14 pages 47 - 48
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam started at 4:50. 
    2. Data Runs:
      8216: 58k trig 2 at 4deg 1/4B and 8k trig 3 at 90deg A1050
      8217: 153k trig 2 at 4deg 1/4B and 21k trig 3 at 90deg A1050
      8219 is running now with 4deg 1/1B
    3. Some scaler rate is 0. Trigger 1 and trigger 4 are not available. Dana recycled one NIM module, and then they are back.
    ------------------------------------------------------------
    


    This archive was generated by hypermail 2.1.5 : Thu Mar 06 2003 - 08:05:49 EST