From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Mar 04 2003 - 20:58:33 EST
------------------------------------------------------------ Date: Tue Mar 4 20:58:33 2003, Shift: 16:00-24:00 Supervisor: ykl, with: rw Log book#14 pages 45 - 46 Shift Summary: ------------------------------------------------------------ 1. short store at the beginning of the shift. MCR is gettiing ready for beam experiments which will begin at 19:00. 2. 8202 MRS at 40 deg, A1050, 93K trig3; FS at 4 deg, 1/2B 67 K trig 2. 8203 MRS at 40 deg, A1050, 7K tig3; FS at 4 deg, 1/4B 11K trig 2. 3. T3 A3-xu tripped and never came back. TOF-II is off. ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Tue Mar 04 2003 - 21:00:05 EST