From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Feb 18 2003 - 23:54:06 EST
------------------------------------------------------------
Date: Tue Feb 18 23:54:06 2003, Shift: 16:00-24:00
Supervisor: SZ, with:
Log book#14 pages 24 - 25
Shift Summary:
------------------------------------------------------------
1. Machine Status
---------------
The beam stayed cogged from the begginning of shift.
It has been dumped at ~ 22:00.
Once in a while the background was very high
--------------------------------------------------
2. Achievements
------------
I proceed to take the last run from the previous shift.
Data Run : MRS 40deg, 1050A, FS 12deg, 1/4B
Run 8011 : 85K trigger3, 17K trigger6
Run 8012 : 125K trigger3, 28K trigger6
Run 8013 : 26K trigger3, 3K trigger6
Run 8014 : 64K trigger3, 18K trigger6;
Trigger4 scale down set to 1000 (from 500), and
Trigger3 scale down set to 2(from 1) for Runs 8011, 8012,8014
--------------------------------------------------------
3. Detector Problems
------------------
16:46 DVM and Si detectors tripped! L1458A was turned off itself!
17:18 TPM1 and TPM2 tripped.
17:24- T1 and T2 tripped, also.
--------------------------------------------------------
Plan :
MRS : need 50K trigger3 at 40-degree, 1050B
FS : need 100K trigger6 at 12-degree 1/4B
------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Tue Feb 18 2003 - 23:58:27 EST