From: Apache (apache@pii3.brahms.bnl.gov)
Date: Fri Feb 14 2003 - 15:51:39 EST
------------------------------------------------------------
Date: Fri Feb 14 15:51:39 2003, Shift: 08:00-16:00
Supervisor: Eun-Joo Kim, with: 
Log book#14 pages 16 - 16
Shift Summary:
------------------------------------------------------------
1. We had a long store from 7am to 3pm.
   Stopped taking-data at 3pm, and gap cleaning started
   at 3:30pm. Liminosity was not great. 
   (ZDC rate 2159[run7891] -> 1373[run7893])
   TOFW/ZDC rate was about 4-6. 
2. Data Run :
   We finished FS 1/20A at 12-degree setting,
   though mainframe L1458B(BFS & RICH) HV was off.
   7890,7891,7892 : MRS 90-degree, 1050B
                    FS  12-degree, 1/20A 
   7893           : MRS 90-degree, 1050B
                    FS  12-degree, 1/8A
   DVM run : 7895
3. TD1(U1,U3,D3) & MRST3 HV were re-setting, and changed
   BRAHVO TRT0 default setting.
   H2 slat top7, bottom 15 : need to fix or check?
   tsir terminal server for TOFW rebooted.
Plan :
 MRS : keep current setting, 90-degree 1050B
 FS  : need more 180K trigger6 at 1/8A 12-degree setting
  
------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Fri Feb 14 2003 - 15:53:50 EST