    1. We had a useful beam from 1:30 until
    around 6:00. The beam was supposed to be dumped at 6:00
    but finally, was dumped at 7:00. The delay in dump was due 
    to abort kicker problem. Between 6:00 and 7:00 the beam was useless (TOFW ~150k).
    
    2. Data runs are 7844, 7845, 7856. Summing these runs we get
    430k of trig. 3 and 70k(8deg.) + 47k(12deg.) of trig. 6.
    
    3. No detector problems detected. 
       FS moved to 12 deg.
    ------------------------------------------------------------
    