From: Apache (apache@pii3.brahms.bnl.gov)
Date: Thu Feb 06 2003 - 16:11:07 EST
------------------------------------------------------------ Date: Thu Feb 6 16:11:06 2003, Shift: 08:00-16:00 Supervisor: PS, with: BB Log book#14 pages 2 - 2 Shift Summary: ------------------------------------------------------------ 1. 30 min. for the beam time at the beginning of this shift, then now beam since now. From 8:30 up to 11:00 we had restricted access to IR. 2. 7811 - non-TPC pedestal run, 7812 - TPC pedestal run 7813 - DVM run. 3. No detector problems detected. ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Thu Feb 06 2003 - 16:11:47 EST