From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Feb 04 2003 - 00:03:02 EST
------------------------------------------------------------ Date: Tue Feb 4 00:03:01 2003, Shift: 16:00-24:00 Supervisor: kh, with: zm Log book#13 pages 146 - 146 Shift Summary: ------------------------------------------------------------ MCR was in the process of dumping the blue beam (deuterons) at the beginning of the shift. This was for the purpose of doing a background study. We observed that the TOFW rate dropped by a factor of 5 when the blue beam was dumped. Plots in the E-Log show the results. Other than that there was no activity during this shift. At shift end, both blue and yellow beam had been injected; then: "Loss monitor pulled the beam permit link" No statement on outlook Run plan for next shift: (if there is beam) MRS: Acquire 300K more at 45 deg 400A Switch to pol 400B and get 400K Move to 40 deg 400K at 1050B 400K at 1050A Move to 35 deg 400K at 500A 400K at 500B FS: Acquire 300K at 1/8B Acquire 300K at 1/15B Acquire 300K at 1/4B ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Tue Feb 04 2003 - 00:07:19 EST