From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sun Feb 02 2003 - 16:39:20 EST
------------------------------------------------------------ Date: Sun Feb 2 16:39:20 2003, Shift: 08:00-16:00 Supervisor: kh, with: zy Log book#13 pages 140 - 142 Shift Summary: ------------------------------------------------------------ Beam during the entire shift (until 13:45) Runs taken: Run FS Setting trig 6 MRS Setting trig 3 7737 1/8A, 181K 6A 188K 7738 1/4A, 35K 6A 19K 7739 1/4A, 1K 6A 3K T1 tripped 7740 1/4A, 59K 6A 106K 7741 1/4A, 6K 6A 11K 7742 1/4A, 24K 2A 58K Beam dumped at 13:35 As noted above, T1 tripped. RD asked for an access to unground T1. He couldn't do it between this store. MCR said maybe after next store. If this coming store is as good as the last, that would be late at night. T5 tripped at the end; probably when they dumped the beam. ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Sun Feb 02 2003 - 16:43:25 EST