Shift report 20030201 08:00-16:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat Feb 01 2003 - 16:24:06 EST

  • Next message: Apache: "Shift report 20030201 16:00-24:00"
    ------------------------------------------------------------
    Date: Sat Feb  1 16:24:06 2003, Shift: 08:00-16:00
    Supervisor: KH, with: ZY
    Log book#13 pages 136 - 137
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam dumped at 10:30. No beam comes after that.
    2. FS magnets changed to 1/8A (D1=427A).  We now have a 
       total of 152+17+13+10K=192K events total at 1/8A
    3. MRS continued at 6A (D5=1050A).  There is now a total
       of about 200K events at that setting
    2. Data runs: 7721, 7722, 7723, 7724 
       T1 anode tripped in run 7721 and 7722
       7726 is TPC pedestal run, 7727 non-TPC pedestal run 
    3. T1 anode tripped three times. We decided to lower the 
        anode voltage to 1200V.
       In addition we set the trip current of T1 anode to
       20uA as well as a peak trip limit of 50uA.
    4. The version of SummaryPlots in operator account was not
       in sync with brntuple in there.  So I updated brntuple
       then found that it would not link.  Traced that to
       BrNtupleScaler not being in makefile, so I fixed that 
       and now that seems to work.
    5. Badtrip was not alerting us when T1 anode tripped, so
       Flemming fixed badtrip to read the proper number of
       from the config file and we also set the config file
       to look at the proper elements to know when to beep.
       We have not been able to test it with beam, but at least 
       it beeped when voltage was turned off.
    ------------------------------------------------------------
    


    This archive was generated by hypermail 2.1.5 : Sat Feb 01 2003 - 16:28:44 EST