Date: Mon Jan 27 2003 - 23:52:02 EST
------------------------------------------------------------ Date: Mon Jan 27 23:52:02 2003, Shift: 16:00-24:00 Supervisor: PS, with: Log book#13 pages 1 - 2 Shift Summary: ------------------------------------------------------------ 1. 4h of beam on this shift, namely from 16:00 to 20:23 Beam was dumped and RHIC people worked on deuteron ramp before the next store. 2. Data runs: MRS 90deg., 6B and FS 3deg. 1/2A: 7662, 7663, 7665 (588k trig#6 for this settings) MRS same FS 3deg. 1/4A: 7667, 7668 (417 trig#6). Other runs: 7671 - pedestal run 7672 - TPC pedestal run, 7675 - DVM run. 3. No detector problem. ------------------------------------------------------------