From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Jan 21 2003 - 16:12:33 EST
------------------------------------------------------------
Date: Tue Jan 21 16:12:32 2003, Shift: 08:00-16:00
Supervisor: JHL, with:
Log book#13 pages 111 - 118
Shift Summary:
------------------------------------------------------------
1. Only 30 min. beam followed by a controlled access and
beam study (machind development)
2. MRS Trigger efficiency has been looked at.
- (Trigger3 NOT satisfied)/(Trigger3 Satisfied) < 1%
for the events with at least 1 MRS Track
- (Events with MRS Track)/(All) ~24%
for Trigger3 Events
- See e-log for details
ZDC rate vs BB and Inel rate vs BB with various
background level: See e-log
3. MF HV1440 (for H1..) lost communication. Recyle the power.
------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Tue Jan 21 2003 - 16:13:02 EST