Shift report 20030114 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Jan 14 2003 - 23:55:43 EST

  • Next message: Peter H. L. Christiansen: "Re: Shift report 20030114 00:00-08:00"
    ------------------------------------------------------------
    Date: Tue Jan 14 23:55:42 2003, Shift: 16:00-24:00
    Supervisor: RP, with: OR
    Log book#13 pages 62 - 63
    
    Shift Summary:
    ------------------------------------------------------------
    beam from 20:00 till 23:14.
    
    runs:
    7379 pedestal run
    7380 TPC pedestal run
    7381 DVM
    
    FS at 8 deg. 1/8 B, MRS 90 deg. 3B
    
    runs:
    7382 tr. 6 240k, tr. 3 23k
    7383        36k         3k
    
    FS at 8 deg. 1/2 B, MRS 90 deg. 3B
    
    runs:
    7384  tr. 6 25k    tr. 3 5k
    
    
    pii12 crash            
     
    ------------------------------------------------------------
    


    This archive was generated by hypermail 2.1.5 : Tue Jan 14 2003 - 23:56:11 EST