From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Jan 14 2003 - 00:19:25 EST
------------------------------------------------------------ Date: Tue Jan 14 00:19:25 2003, Shift: 16:00-24:00 Supervisor: cr, with: or Log book#13 pages 57 - 59 Shift Summary: ------------------------------------------------------------ 1. Machine setup until 21. 2. 7362 - pedestal run. 7363 - TPC Pedestals 7364 - DVM run 7365 - Data run - finished the 1/4 field A pol (250k trig6) 7366 - Data run, at 0 field, but unfortunatelly with all magnets. 7367 - Data run with D1 at 1/4 A pol, to be continued the next shift. 3. All detectors are working, except for T3. ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Tue Jan 14 2003 - 00:25:26 EST